← Cases
United StatesManufacturing2019 – ongoing

Alcoa

Predictive maintenance for aluminum-smelter equipment

Alcoa's smelter maintenance project reduced unplanned downtime by 20%, according to AVEVA

WorkingVendor case studyVendor ↗

Problem

Alcoa stored machine sensor readings and maintenance records in separate systems. It lacked a useful way to combine them to predict failures.

Approach

Alcoa tested Senseye at its Fjardaal smelter in Iceland. AVEVA PI System's asset framework connected operating data with Oracle eAM maintenance records. Maintenance crews investigated detected faults before equipment failed.

Results

20%decrease in unplanned downtime reported by AVEVAVendor case study[1]
10%decrease in maintenance person-hours reported by AVEVAVendor case study[1]

Takeaway

Crews checked an apparently functioning saw motor during a scheduled shutdown and found a loose belt guard. The repair avoided an unscheduled stop, according to AVEVA.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Vendor case study

Sources

Source summaries

[1]AVEVA2023

AVEVA described Alcoa's maintenance deployment with Senseye. It reported 20% less unplanned downtime and 10% fewer maintenance person-hours.

Full details are in the original sources.

Added 1 Nov 2026 · Updated 1 Nov 2026
Open case page ↗