Astellas Pharma

Binocs scheduling for the Killorglin quality-control laboratory

Astellas shortened laboratory lead times by approximately 15%, according to Bluecrux

WorkingVendor case studyVendor ↗

Problem

The Killorglin laboratory scheduled work on paper and spreadsheets. Operational knowledge depended on individual employees.

Approach

Astellas introduced Binocs AI scheduling with Bluecrux after a proof of concept. Laboratory staff helped configure the system, and internal super users supported colleagues. The system automated scheduling and grouped samples for testing.

Results

approximately 15%reduction in laboratory lead times reported by BluecruxVendor case study[1]

Takeaway

The rollout moved scheduling knowledge into a shared system and gave staff earlier visibility of their work.

Categories

Business function
Production and quality
Innovation type
Process innovation
AI technology
Optimization
Evidence
Vendor case study

Sources

Source summaries

[1]Bluecrux21 Jan 2025

Bluecrux described replacing manual scheduling at Astellas' Killorglin laboratory. It reported approximately 15% shorter lead times and described staff training during implementation.

Full details are in the original sources.