Chugoku Electric's hydropower trial reduced annual dam spill by about 6 million cubic metres

WorkingVendor case studyVendor ↗

Problem

Rainfall forecasts did not reliably predict the amount and timing of water entering dams. Operators struggled to schedule generation around changing inflows and electricity demand.

Approach

Chugoku Electric began exploring hydropower AI around 2019 and developed a planning system with ExaWizards. The system combined inflow predictions with mathematical optimisation. A roughly year-long trial at Sasanamigawa Dam preceded full operation at 2 dams in summer 2023.

Results

about 6 million m3annual reduction in dam spill during the Sasanamigawa trial, reported by ExaWizardsVendor case study[1]

Takeaway

Forecasting inflows supported generation before incoming rain filled the reservoir. Trial results at Sasanamigawa Dam did not establish equivalent savings across the fleet.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Vendor case study

Sources

Source summaries

[1]ExaWizards22 Nov 2023

ExaWizards described jointly developed inflow forecasting and generation planning. It reported about 6 million cubic metres less annual spill in the trial and full operation at 2 dams from summer 2023.

Full details are in the original sources.