← Cases
IndiaManufacturing2024 – ongoing

Ola Electric Mobility

Ola Digital Twin on NVIDIA Omniverse for the Futurefactory

Ola Electric said its factory digital twin cut design-to-commissioning time by 20%

In progressCompany's own claimVendor ↗

Problem

Ola Electric was building a large automated two-wheeler plant in India. It needed to plan the lines, check quality processes and train robots before and during commissioning.

Approach

Ola built the Ola Digital Twin platform on NVIDIA Omniverse and Isaac Sim, with its Krutrim AI unit. The twin was used to plan the Futurefactory, to simulate manufacturing and quality inspection, and to compare real and simulated environments for predictive maintenance. Synthetic data from the twin was used to train autonomous mobile robots and robotic arms.

Results

20% faster time to marketgain from design to commissioning, as stated by Ola in NVIDIA's blogCompany's own claim[1]

Takeaway

A factory twin gave Ola one model for planning, inspection and robot training. The time saving is the company's own figure.

Categories

Innovation type
Process innovation
Evidence
Company's own claim

Sources

Source summaries

[1]NVIDIA23 Oct 2024

NVIDIA described how Ola Electric used a digital twin built on Omniverse and Isaac Sim to plan its Future Factory, run quality inspection and manufacturing processes, support predictive maintenance and generate synthetic data for robots. It reported a 20% faster time to market from design to commissioning.

Full details are in the original sources.

Added 1 Nov 2026 · Updated 1 Nov 2026
Open case page ↗