Problem

Older equipment depended on periodic inspections and manual lubrication. Replacement parts could take months to arrive after a failure.

Approach

Owens Corning installed Waites wireless vibration and temperature sensors with AI analysis and analyst support. A February 2024 alert at Tessenderlo prompted inspection of a ball-mill bearing. Technicians found a cracked shaft and replaced damaged parts, then added automatic lubrication.

Results

over $11 millionpotential downtime, production and repair costs avoided, estimated by WaitesVendor case study[1]

Takeaway

The alert prompted technicians to inspect and repair the mill before a breakdown. The reported savings were Waites' estimate of potential losses avoided.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Vendor case study

Sources

Source summaries

[1]Waites2025

Waites documented a bearing-temperature alert at the Belgian plant and subsequent repairs. It attributed over $11 million in avoided potential costs to the intervention.

Full details are in the original sources.