United StatesManufacturing2020 – ongoing

Sibanye-Stillwater

DomainMCF geological and ground-control modelling trial in Montana

Sibanye-Stillwater's first DomainMCF test model took 2 hours and 15 minutes

In progressVendor case studyVendor ↗

Problem

Ground-type modelling at the Montana mines required labor-intensive interpretation. Missing geotechnical observations left gaps in models used to assess ground-support requirements.

Approach

Sibanye-Stillwater began evaluating Maptek DomainMCF in 2020. The trial used coded lithology logs to generate predicted block models for ground-control work. Teams also tested the mineralized domain against their existing modelling workflow.

Results

2 hours and 15 minutesgeneration time for the first test model, according to MaptekVendor case study[1]

Takeaway

Standardized input data required little preparation for the initial test. Further reconciliation and proving tests remained planned.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Vendor case study

Sources

  1. Data driven modelling in a production environment
    MaptekSep 2021Vendor publication

Source summaries

[1]MaptekSep 2021

Maptek described the Montana trial and its first model-generation time. A senior rock mechanics engineer reported updates taking minutes rather than days, with additional validation planned.

Full details are in the original sources.