Sino Land
PlantPRO AI chiller optimisation
Sino Land reported approximately 7% lower ventilation and air-conditioning energy use at China Hong Kong City after installing PlantPRO
Problem
Sino Land sought to reduce energy consumption in cooling systems at its managed properties.
Approach
Sino Land worked with CLPe Solutions on PlantPRO, which used AI to optimise chiller operation and maintenance. Following deployments at Olympian City 3 and Island Resort Mall, the company installed it at China Hong Kong City during the reporting period.
Results
Takeaway
Sino Land linked the approximately 7% reduction to the China Hong Kong City installation. It did not report corresponding figures for Olympian City 3 or Island Resort Mall.
Categories
- Size
- Large enterprise
- Industry
- Real estate
- Business function
- Production and quality
- Innovation type
- Process innovation
- AI technology
- Optimization
- Adoption
- Vendor solution
- Goal
- Cost savings
- Evidence
- Company's own claim
Sources
Source summaries
Sino Land described its PlantPRO installations at managed properties. It linked the installation at China Hong Kong City to approximately 7% lower mechanical ventilation and air-conditioning energy consumption.
Full details are in the original sources.