← 案例

此案例目前僅提供英文版本。

巴西製造業2024 – 進行中

Vale

Conceição 2 'Model Plant' with AI process control (Itabira)

Vale said an AI-run iron ore plant in Itabira raised productivity 25% in under two years

已見成效企業自行發布官方資料 ↗

問題

Vale's Conceição 2 iron ore processing plant in Itabira, Minas Gerais, had bottlenecks, and operators spent time in the field.

做法

Vale rebuilt the plant over about 1.5 years with 51 solutions, with ABB as technology integrator. A data layer controls more than 400 variables, and AI layers adjust the process in real time using online ore-grade analysis. About 7,300 automated instruments and over 100 cameras support remote operation from control rooms. The plant was inaugurated on 10 June 2026.

主要數據

+25%plant productivity gain in under two years of the pilot, per Vale企業自行發布[1][2]
-26%drop in average iron content in waste in 2026, per Vale企業自行發布[1][2]
11.2 Mt/yrplant capacity reached, up from 9 Mt in 2024, per Vale企業自行發布[1]

啟示

Vale combined AI process control with automated instruments and remote operation across the plant. The reported gains were the company's own figures.

分類

產業
製造業
業務職能
生產與品質
創新類型
流程創新
依據
企業自行發布

來源

來源摘要

[1]Vale2026年6月10日

Vale reported a 25% productivity gain in under two years at its Conceição 2 plant, a 26% fall in iron content in waste, 11.2 Mt/yr capacity and 92% water recirculation. It lists the AI layers, 7,300 instruments and 51 solutions, and names ABB as integrator.

[2]InfoMoney2026年6月10日

InfoMoney reported on the inauguration on 10 June 2026 and attributed the figures to Vale executives Carlos Medeiros and Rafael Bittar. It repeats the 25% productivity gain, the 26% fall in iron in tailings, the 51 solutions and the 1.5-year timeline.

詳細內容請參閱原始資料。

收錄日期 2026年10月25日 · 更新日期 2026年10月25日
開啟案例頁面 ↗