← Cases
United StatesEnergy and utilities2025 – ongoing

AES

Maximo robots for solar module installation

AES's solar-installing robots placed 100 MW of panels at a California site, at about twice the regional crew rate

WorkingCompany's own claim

Problem

Utility-scale solar farms need large numbers of heavy modules lifted and placed by hand, which limits how fast power producers such as AES can build new capacity and depends on the availability of field crews.

Approach

AES incubated Maximo, a robot that drives along module rows on tracks and uses an arm to set panels on pre-assembled mounts. At AES's Bellefield complex in California the deployment grew from one robot to four version 3.0 units working alongside union technicians. Development used NVIDIA simulation tools to test capabilities before field updates and Amazon Web Services for computing and analysis of robot data.

Results

100 MWutility-scale solar installed with the robots at the Bellefield complexCompany's own claim[1][2]
up to 24modules installed per shift hour per crew member, nearly double traditional regional methodsCompany's own claim[1]

Takeaway

The robots worked with existing crews, whose jobs remained, and productivity was measured per crew member. The company did not disclose cost, reliability or error data in its March 2026 announcement.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Company's own claim

Sources

  1. Maximo completes 100-megawatt robotic solar installation
    Robotics 24/729 Mar 2026News article

Source summaries

[1]Robotics 24/729 Mar 2026

The robotics trade outlet reports the company's announcement that Maximo installed 100 MW at AES's Bellefield complex, moving from early testing to sustained production. It says the fleet grew from one to four version 3.0 robots, crews reached up to 24 modules per shift hour per person, nearly double traditional regional methods, and each unit exceeded one module per minute. It names NVIDIA and AWS as technology contributors.

[2]eWeek31 Mar 2026

eWeek reports that Maximo installed 100 MW and describes version 3.0 as the most capable so far, with reported use of NVIDIA tools and AWS support. It says the robots reached 100 MW sooner than comparable Southern California sites.

Full details are in the original sources.

Added 25 Oct 2026 · Updated 25 Oct 2026
Open case page ↗