Hokkaido Electric Power
AI engine for thermal and hydro generation planning, built with Grid
Hokkaido Electric Power and Grid estimated about 600 million yen a month in thermal fuel cost savings from an AI planning engine
Problem
Experienced staff planned thermal generation by hand the day before, which took 4 to 6 hours.
Approach
Hokkaido Electric Power and Grid developed an engine that combines machine learning and optimization AI for thermal and hydro supply-demand planning. The thermal part went into operation in March 2024. Adding hydropower was planned, with full operation targeted for around spring 2025.
Results
Takeaway
The savings figure came from a one-month comparison with manual results, and hydro and the shorter calculation time were still expectations at the time.
Categories
- Size
- Large enterprise
- Industry
- Energy and utilities
- Business function
- Production and quality
- Innovation type
- Process innovation
- AI technology
- OptimizationPredictive analytics and ML
- Adoption
- Partner co-development
- Goal
- Cost savings
- Evidence
- Company's own claim
Sources
Source summaries
Robot Start, syndicated on livedoor News, reported the 3 June 2024 announcement by Hokkaido Electric Power and Grid. The thermal engine ran from March 2024, and a comparison with January 2024 manual results gave about 600 million yen a month. The article said hydro would add an expected further saving and a calculation time of about 10 minutes was expected.
Full details are in the original sources.