South KoreaEnergy and utilities2021 – ongoing

Korea Electric Power Corporation

SEDA real-time substation equipment diagnosis

KEPCO reported preventing 17 equipment failures in 2025 with its SEDA diagnostic system

WorkingCompany's own claimOfficial ↗

Problem

Periodic inspections could miss faults developing between visits. KEPCO needed to monitor aging power equipment with limited maintenance resources.

Approach

KEPCO introduced SEDA's real-time AI diagnosis in 2021. It combined sensor signals with equipment specifications and maintenance records to assess condition and prioritize work. In May 2026, KEPCO signed a technology transfer agreement with Germany's Maschinenfabrik Reinhausen; integration into the partner's platform remained planned.

Results

17equipment failures KEPCO said it identified and prevented in 2025Company's own claim[1]
$1.34 millionvalue of the signed May 2026 technology transfer agreement, rather than realized operating savingsCompany's own claim[2]

Takeaway

Condition assessments also informed replacement priorities. The disclosed prevented-failure count was KEPCO's own assessment.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Company's own claim

Sources

  1. 전력망 운영의 패러다임을 변화시킬 혁신 솔루션, SEDA
    Korea Electric Power CorporationMar 2026Company publication

Source summaries

[1]Korea Electric Power CorporationMar 2026

KEPCO described SEDA's operational introduction in 2021 and its use of sensor and maintenance data. It reported preventing 17 equipment failures in 2025 and using condition assessments to prioritize investment.

[2]The Asia Business Daily21 May 2026

The Asia Business Daily reported a $1.34 million technology transfer contract signed with Maschinenfabrik Reinhausen. It described integration into TESSA 2.0 as a future development.

Full details are in the original sources.