← Cases
CanadaManufacturing2023 – ongoing

Ballard Power Systems

Machine learning at test stations to shorten fuel-cell stack acceptance tests

Ballard Power Systems cut fuel-cell stack test time by 80% in a proof of concept with Acerta's machine learning

In progressVendor case studyVendor ↗

Problem

Factory acceptance tests on Ballard's PEM fuel cell stack assemblies took about 2.5 hours. The company also wanted to find the sources of test failures.

Approach

Acerta Analytics built custom models and ran them on a subset of Ballard's test data in a proof of concept. The two companies then started a two-year project, partly funded by NGen's AI for Manufacturing program. The models are to run on edge devices at the test stations, with Acerta's LinePulse software monitoring them.

Results

80%reduction in test cycle times in the proof of concept (2.5 hours to under 30 minutes), per AcertaVendor case study[1]

Takeaway

The 80% result came from a subset of test data and the vendor's own release. The full factory rollout was still ahead when it was published.

Categories

Business function
Production and quality
Innovation type
Process innovation
Evidence
Vendor case study

Sources

Source summaries

[1]EIN Presswire (Acerta Analytics release)6 Jul 2023

Acerta announced a multi-year project with Ballard to shorten acceptance test times and find causes of test failures in fuel cell stacks. It states that a proof of concept cut test cycle times by 80%, from 2.5 hours to under 30 minutes. The figures are the vendor's own.

Full details are in the original sources.

Added 1 Nov 2026 · Updated 1 Nov 2026
Open case page ↗